
Autodesk · Coordination & clash
Autodesk Navisworks
Federate, clash, group, report — without the manual week.
A coordination cycle is mostly repetition: reload the discipline models, re-run the same clash tests, deduplicate thousands of hits into the few dozen that matter, assign them, capture viewpoints, and rebuild the report. These routines run that cycle end to end and hand back the package.
- automations
- 50
- groups
- 8
- listed as tools
- 0
- role
- Coordination & clash
Need something specific in Navisworks?
Describe the task, roughly how often it runs, and how long it takes today. We will tell you whether it is already covered or worth building.
+971 50 605 5153 · info@bimautomationconsulting.com






